AW Construction Project No.2 – South Dublin

#Laminate

Introduction

A second project in South Dublin alongside AW Premium Construction. The property is a busy household and the client wanted a flooring solution that could withstand a lot of traffic.

The Process

  • Installation of the whole ground floor including bathroom and kitchen.
  • Subfloor was checked and prepped prior to install, ensuring no issues with flooring once laid.
  • Underlay per manufacturing guidelines was used.
  • Matching profiles and skirting boards were meticulously applied to ensure a high-quality final result.

The Results

The client received not only a beautiful floor but one that was:

  • Able to cope with heavy traffic.
  • Installed with Aqua Protect and AC4/class 32 ratings, ensuring longevity.
  • Met the client's brief from an aesthetic perspective.
Love what you see?
Contact us now and let’s bring your dream floors to life.